01What changed
Since 27 January 2026 Ofgem has regulated heat networks in England, Scotland and Wales. The rules are in the Heat Networks (Market Framework) (Great Britain) Regulations 2025, and Ofgem’s authorisation conditions sit underneath them.
Networks that were already running were authorised automatically. Ofgem calls this deemed authorisation. To keep it, the operator and the supplier have to register.
02Is your building a heat network?
A heat network moves heat, through water or another fluid, from a shared source to more than one place. A communal heat network does this inside one building that is divided into separate homes, such as a block of flats with one boiler in the plant room. A district heat network supplies two or more buildings.
You do not need to apply for an exemption. If one of these applies, the rules simply do not:
- A house in multiple occupation where residents share a kitchen or bathroom. Converted blocks of self-contained flats are not covered by this exemption.
- A single converted building with one heat source of 45 kW or less, which is about the size of a large domestic boiler.
- A building with shared facilities that is not divided into separate homes, such as a care home.
- A communal network that only provides air conditioning for heating or cooling, with no hot water.
- Several flats. Separate homes, one building.
- Shared pipework. Heat or hot water to each flat.
- One heat source. Usually a boiler in the plant room.
03Operator and supplier
The operator has control over, and responsibility for, moving heat around the network. The supplier runs the customer side: contracts, billing, complaints and communications. In most blocks of flats one organisation is both, usually the freeholder, the residents’ management company, the right-to-manage company or the landlord.
Owning the boiler does not by itself make you the operator, and a contractor who maintains it does not become the operator. If you are unsure who holds which role, the scope check walks through it, and Ofgem’s heat networks team will answer questions directly.
04Key dates
The registration deadline for existing networks is 26 January 2027. From 27 January 2027, anyone starting a new network will need to apply for authorisation before they begin. That is why some sites quote 27 January: it is a different rule, for new operators.
- 27 Jan 2026 Ofgem starts regulating heat networks
- Autumn 2026 Quarterly and annual data reporting opens
- 26 Jan 2027 Registration deadline for existing networks. From 27 Jan, new operators must apply for authorisation first.
- 2027 Technical assurance scheme (HNTAS) planned
Today is 19 November 2026, 68 days before the registration deadline.
05Registering
Registration is an online declaration through Ofgem’s heat networks digital service. You do not upload documents. Declaring that you do not yet meet every requirement does not stop you registering.
Each organisation names a regulatory contact, usually its most senior person responsible for heat networks. That person creates the account with GOV.UK One Login and makes a declaration that the people running the network are fit and proper. They can then add other users, such as an adviser, to help complete it.
To register, Ofgem asks for
- Organisation details, and any parent companies
- Financial resilience: profit or loss, liquid assets, running costs, income, energy hedging
- A fit and proper declaration for everyone with significant managerial responsibility
- The energy centre: location, capacity and main technology
- Customers and metering, including prepayment and any billing agent
- Consumer protections: vulnerable customers, a priority services register, complaints and payment difficulty
- Billing: how often, and how charges are explained
06Protecting residents
Suppliers need a complaints procedure. Bills must tell residents to complain to the supplier first, and that the supplier has 8 weeks to resolve a complaint before the resident can go to the Energy Ombudsman. Suppliers must register with the Energy Ombudsman’s heat network scheme. Complaints of a housing nature may go to the Housing Ombudsman instead.
Ofgem expects support for residents in vulnerable situations, including a Priority Services Register, and a process for anyone who struggles to pay. Where heat is metered, residents should get a bill based on actual use at least once a year, with an explanation of how it is worked out.
Back-billing is capped. The general rule is no bills for heat used more than 12 months ago where the resident is not at fault. Where heat is recovered through a service charge, Section 20B of the Landlord and Tenant Act 1985 currently takes precedence: the landlord has 18 months from when a cost is incurred to demand it or tell the leaseholder about it.
07Reporting to Ofgem
Registered networks send data to Ofgem every quarter and every year. Ofgem’s quarters run from April. Quarterly data is due by the last day of the month after the quarter ends. The annual return is due by 30 April. Financial resilience figures follow your accounts, and are due no later than 10 months after your financial year end.
Ofgem is particularly interested in debt, fair pricing, financial resilience, quality of service and vulnerability. A network that registers late must still submit data recorded from April 2026 onwards.
- Quarter 1 April to June Return due31 July
- Quarter 2 July to September Return due31 October
- Quarter 3 October to December Return due31 January
- Quarter 4 January to March Return due30 April Annual return due the same day
The deadline and every return due in the next 12 months, with a reminder two weeks before each.
08Changes you must tell Ofgem about
After registering, you must tell Ofgem about material changes. These include:
- Selling the building, or otherwise transferring the operator or supplier role
- Adding or removing connected buildings or energy centres
- Changing the fuel or technology of the energy centre
- Starting bulk supply, or changing the type of customer
- Removing a heat network
09Enforcement
Ofgem can order you to comply, and can fine or order compensation of up to 10% of turnover or £1 million, whichever is higher. That is a ceiling, not what a typical block faces.
10What is coming next
A technical assurance scheme, HNTAS, is planned for 2027. It will assess the energy centre and the pipework against technical standards. The timetable and the requirements for existing networks have not been finalised.
Ofgem consults on its rules and guidance regularly, so the requirements will keep developing.
Glossary
- Authorisation
- Permission from Ofgem to operate or supply a heat network. Existing networks have it automatically, on condition that they register.
- Authorisation conditions
- The rules Ofgem attaches to every authorisation, covering registration, consumer protection, reporting and more.
- Communal heat network
- A heat network inside one building that is divided into separate homes.
- Deemed authorisation
- The automatic authorisation given to networks that were already running when regulation began.
- District heat network
- A heat network that supplies two or more buildings.
- Energy centre
- Where the heat is produced, such as a boiler plant room.
- Energy Ombudsman
- The independent body that handles heat network complaints that suppliers have not resolved within 8 weeks.
- Fit and proper
- Ofgem’s test that the people with significant control over a heat network are suitable for the role.
- HNTAS
- The Heat Network Technical Assurance Scheme, planned for 2027, which will check networks against technical standards.
- Operator
- The organisation with control over, and responsibility for, moving heat around the network.
- Priority Services Register
- A list of residents who need extra support, for example because of age, health or disability.
- Regulatory contact
- The person an organisation names to Ofgem, usually its most senior person responsible for heat networks.
- Section 20B
- The part of the Landlord and Tenant Act 1985 that limits service charge demands to costs incurred in the last 18 months, unless the leaseholder was told about them.
- Supplier
- The organisation responsible for the customer side: contracts, billing, complaints and communications.
Sources
Every statement in this guide comes from these documents. Read the originals before relying on anything here. For what Ofgem has published and when, see what’s changed.
- Ofgem: heat networks (opens in a new tab)
- Ofgem: who should register (opens in a new tab)
- Ofgem: how to prepare for registration (opens in a new tab)
- Ofgem: heat networks registration guidance (January 2026) (opens in a new tab)
- Ofgem: consumer protection guidance (January 2026) (opens in a new tab)
- Ofgem: regular data reporting guidance (March 2026) (opens in a new tab)
- Ofgem: what happens after registration (opens in a new tab)
- Ofgem: penalty policy (February 2026) (opens in a new tab)
- The Heat Networks (Market Framework) (Great Britain) Regulations 2025 (opens in a new tab)
- GOV.UK: Heat Network Technical Assurance Scheme (opens in a new tab)
- Energy Ombudsman: heat network suppliers (opens in a new tab)