The heat network registration deadline is 26 January 2027
Every existing communal and district heat network in Great Britain must be registered with Ofgem by this date. Here is what the date means, and why you may have seen another one.
Last checked against Ofgem’s guidance on . General information, not legal advice.
01The date
Ofgem’s guidance says operators and suppliers of existing heat networks must register by 26 January 2027. That includes a block of flats where one boiler or plant room supplies heating or hot water to more than one flat.
There is no separate application for existing networks. They are already authorised, and registering is how they keep that authorisation.
68days left
Register by 26 January 2027. About 9 weeks to go.
02Why some sites say 27 January 2027
27 January 2027 is a different rule. Ofgem has consulted on how anyone who starts to operate or supply a new heat network from that date will apply for authorisation before they begin. It does not give existing networks an extra day.
If your block’s heating was already running, work to 26 January 2027.
03How the dates fit together
Regulation began on 27 January 2026. Data reporting through Ofgem’s digital service follows registration, with data backdated to April 2026. A technical assurance scheme, HNTAS, is planned for 2027.
- 27 Jan 2026 Ofgem starts regulating heat networks
- Autumn 2026 Quarterly and annual data reporting opens
- 26 Jan 2027 Registration deadline for existing networks. From 27 Jan, new operators must apply for authorisation first.
- 2027 Technical assurance scheme (HNTAS) planned
Today is 19 November 2026, 68 days before the registration deadline.
04If you are running late
Registering is a condition of the authorisation an existing network already holds. If the deadline has passed or is close, register as soon as you can rather than waiting to have every answer perfect: declaring that you do not yet meet a requirement does not stop you registering.
Ofgem can order you to comply, and can fine or order compensation of up to 10% of turnover or £1 million, whichever is higher. That is a ceiling, not what a typical block faces.
05A plan that works back from the deadline
Most of the time goes on gathering information, not on the online form. A sensible order:
- Confirm the block is in scope, using the scope check
- Agree who is the operator and who is the supplier, and who will be the regulatory contact
- Collect the latest accounts and the financial resilience figures
- Write down the heating set-up: plant room address, boiler capacity and fuel
- Check you have a complaints procedure and a way to support residents in vulnerable situations
- Have the regulatory contact create the account and make the fit and proper declaration
- Complete and submit the registration, then diary the first reporting window
The guide to registering walks through each step in Ofgem’s digital service.
The deadline and every return due in the next 12 months, with a reminder two weeks before each.